Touchplan Blog

  • Read More
    18 Sep
    Lean Training: Q&A With Lean Consultant Hal Macomber

    Katherine Van Adzin: How did you get started as a Lean consultant?

    Hal Macomber: I've been involved with Lean since around 1984. I've been involved with the Last Planner® System since 1997. I've..

  • Read More
    11 Sep
    Lean Training: How to Track and Measure Takt Time in Touchplan

    The term “takt time” comes from the German word “Takt,” which refers to a bar of music or meter. In the context of Lean, the term is used to refer to the pace of production required to match..

  • Read More
    06 Sep
    ANDRES Case Study

    Curious about Touchplan, but not sure what an implementation would look like inpractice? Read our case study on ANDRES, a general contractor based in Dallas, Texas, that opted for an enterprise..

  • Read More
    04 Sep
    Lean Training: How to Manage Day and Night Shifts Using Touchplan

    We're frequently asked, “What’s the best way to manage multiple shifts in Touchplan?” The simple solution is to use a combination of locations and swim lanes. The locations will allow you to sort..

  • Read More
    30 Aug
    Lean Conversations: Q&A with Tom Richert

    Tom Richert, a Principal with Lean Project Consulting, dropped by Touchplan last week for a conversation about his new book, Lean Conversations: The Energy of the Creative Ethos in Your Life and..

  • Read More
    02 Aug
    How to Schedule Projects Better with CPM and LPS

    Critical path method (CPM) scheduling has been part of the construction industry for decades, and is a widely used form of schedule management. A CPM schedule is created by compiling a list of the..

  • Read More
    26 Jul
    Touchplan Vlog: The New Solution for Project Planning

    The Last Planner® System is a uniquely effective way to plan your project and organize your team, but the pull planning process itself can be time-consuming and inefficient. Typically,..

  • Read More
    12 Jul
    An Intro to the Last Planner® System

    This post originally appeared on PlanGrid's Construction Productivity Blog

    The Last Planner® System (LPS) is a realistic way to collaboratively manage project-based production. It enables issues..

  • Read More
    20 Dec
    Calling all Projects

    Would you like to be a company featured by Touchplan? If so, let us know about your project today. How has collaboration helped make your project more efficient? What worked where other efforts..