    Touchplan General Contractors See Improved Rankings in ENR’s 2018 Top 400 List

    The recently released Engineering News-Record (ENR) general contractor rankings for 2018 reveal that Touchplan is used by ten percent of the 400 general contractors listed. Within the top 100,..

  • Read More
    21 Jun
    The Benefits of Digital Pull Planning: Q&A with Touchplan’s Michael Carr

    I talked to Touchplan President Michael Carr to learn more about why Lean construction companies are transitioning to digital implementations of the Last Planner® System. Read on to find out what..

  • Read More
    27 Dec
    Working with Shawmut Design and Construction

    In May of 2015 Shawmut Design and Construction began using Touchplan on their construction of Brown University’s New School of Engineering in Providence, RI.

    As part of our customer support, we..

  • Read More
    21 Dec
    Working with Bernards: Commercial Builder and Construction Management Company

    In collaboration with HMC Architects, Bernards is serving as design-builder for a six-story, 160,000 SF patient tower at the Henry Mayo Newhall Hospital which will connect to the existing..

  • Read More
    06 Sep
    The Touchplan Way

    What are the benefits that you could be seeing if you started planning your project with the Touchplan method? Here are just a few things that we have seen happen on the projects that are..

  • Read More
    23 Aug
    Bringing Touchplan to the Next Generation of Construction Planners

    Technology is everywhere we look, in almost every part of our lives. It affects how we shop, socialize, play, work, and most importantly learn. With their great and increasing presence in our..

  • Read More
    14 Jul
    Limited Integration Prevents Use of Technology in Construction.

    Construction has consistently lagged behind other industries in the use of technology.  This is starting to change, as seen in the 2015 Construction Technology Survey conducted by JBKnowledge Inc...

  • Read More
    07 Jun
    Skanska discovers shipwreck in Boston Seaport District

    According to the World Economic Forum’s publication Shaping the Future of Construction–A Breakthrough in Mindset and Technology there is a great need for greater productivity in construction. The..

  • Read More
    18 May
    Productivity Boosts Needed in Construction

    According to the World Economic Forum’s publication Shaping the Future of Construction–A Breakthrough in Mindset and Technology there is a great need for greater productivity in construction. The..