Technology and Constraint Logs

1st LPS 5 Steps

We know that constraints are those directives, resources and prerequisite work needed to start and complete a task. Constraints can fall through the cracks if you don't stay on top of checking the constraint log regularly. 

In a typical Last Planner® build, the make-ready planner maintains the constraint log.

Managing constraints is much more efficient using Touchplan. Instead of a separate constraint log that must be checked, Touchplan shows when constraints are linked to tickets or are needed by a specific date. There is still a scheduler, or make-ready planner in charge of managing constraints, but every last planner can see the constraints in the tool.

Once you've identified the constraints, it's important to know how to resolve them.

Here are our top five tips for resolving constraints:

  1. Review the look ahead plan with your project team each week (or more often) for existing constraints and to uncover additional constraints. 

  2. Get promises for resolving or addressing each constraint. 

  3. Have those promises recorded on the weekly work plan. 

  4. Do not let work move onto the weekly work plan that isn't ready. 

  5. Replan work that wasn't performed as planned. Don't automatically move the work to the next week. 

What Is Lean? A Beginner's Guide.
Technology and the Last Planner® System

About Author

Default Author Image
Touchplan

Related Posts
Recap: LCI Congress 2019
Recap: LCI Congress 2019
Touchplan at GLCI Karlsruhe
Touchplan at GLCI Karlsruhe
7 Tips to Maximize Project Profitability
7 Tips to Maximize Project Profitability

Comment

Subscribe To Blog

Subscribe to Email Updates