Touchplan Blog

Filter by Category
Filter by Category

Technology and the Last Planner® System

Technology

The Last Planner® System makes your workflow smooth, and saves you both time and money. LPS optimizes your construction process and makes your project more efficient. One way to increase that efficiency even more is by using technology in conjunction with Last Planner®.

Constraints can fall through the cracks if you do not stay on top of checking the constraint log regularly. Here is how Touchplan works to keep you up-to-date on constraints, and what to do once you're faced with them.

Technology and Constraint Logs
Release 14 Update

About Author

Default Author Image
Touchplan

Related Posts
Recap: LCI Congress 2019
Recap: LCI Congress 2019
Touchplan at GLCI Karlsruhe
Touchplan at GLCI Karlsruhe
7 Tips to Maximize Project Profitability
7 Tips to Maximize Project Profitability

Comment

Subscribe To Blog

Subscribe to Email Updates