Touchplan Blog

Filter by Category
Filter by Category

Granger Case Study

DSC01247edit

Read our case study on Granger Construction, a general contractor based in Lansing, Michigan, that undertook a $3.1 million project to substantially renovate the 5 Foster Pediatric Unit of Sparrow Hospital. Working against a hard deadline in a high-stakes environment, the team finished six weeks ahead of schedule to reopen the pediatrics unit sooner with cost savings that enabled upgrades to the original project scope.

Download Case Study

 

 

 

It's Almost Time for LCI Congress 2018...
LPS Is a Kaizen Method—Here’s Why That Matters

About Author

Katherine Van Adzin
Katherine Van Adzin

Katherine is the Content Marketing Manager at Touchplan. Have an idea for the blog? Get in touch at kav (at) touchplan (dot) io.

Related Posts
Construction and the Cloud
Construction and the Cloud
7 Tips to Maximize Project Profitability
7 Tips to Maximize Project Profitability
Touchplan Featured in ENR Technology Q&A
Touchplan Featured in ENR Technology Q&A

Comment

Subscribe To Blog

Subscribe to Email Updates